Review the equipment
Document its interfaces, electrical requirements and existing controls.
Give existing equipment a new role
Explore a practical route from traditional electrical equipment to application-controlled operation.
From requirement to pilot
Document its interfaces, electrical requirements and existing controls.
Compare an external controller, a replacement component or a deeper hardware redesign.
Check manual operation, failure behavior and the software workflow on a pilot installation.